New schools, better healthcare and improved job opportunities all contribute to an enhanced quality of life for CBG employees, their families and neighbors. Is a part of our pledge to our employees and our neighbors to build stronger communities while preserving a local heritage. Our contributions to these communities continue to demonstrate that mining is an integral contributor to society.

Colombian Ports




Puerto Brisa

Location
11° 15' 37.96’’ N; 73° 22' 56.11’’ W. 

Port Restrictions
MAX LOA 305m MAX BEAM 45m 
MAX DRAFT allowed to ships alongside 15 m BW
DEPTH 66Ft
MAX AIR DRAFT allowed - DWLTHC 21m
Type of wharf - Platform
Wharf length 360m   
Load Rate: 5,000 MT/Hour
Loading: Belt Conveyor
MAX LOAD SIZE. 180,000MT

Cartagena 

Location
Lat 10 19' N; Long 75 35' W.

Port Restrictions
MAX LOA 195 m MAX BEAM N/A MAX DRAFT 11,20 m BW
DEPTH 12 m
MAX DWT 55000  MAX AIRDRAFT 10m ldg w/shore crane
Load Rate: 10,000 MT/day
Max Load size. 45,000MT

Vessel with draft over 13m S.W. and 42m of beam must comply with The maneuvers are subject to previous authorization from the harbor master office (the authorization must be requested at least 48 hours in advance).

Vessel must be assisted by minimum 2 (Two) tugboats and 2 (two) pilots Restricted to early morning hours and weather conditions.

Services Available
Bunkers, Fresh Water, Provisions, Workshop Repairs, Dry-docks up to 3,600 DWT, Security Services (Watchmen), Class and various Inspections.

Barranquilla 

Location
LAT. 10 DEG. 58 MIN. N LONG. 74 DEG. 46 MIN. W.

Note the following important information applicable for all terminals in this port:
*Draft in the river mouth and the navigational channel can change suddenly due to constant river flow changes.
Even though 24 hrs of navigation is the normal operative condition, Port Authorities may authorize daylight navigation only (0600 – 1800 hrs) as per current weather and/or the Magdalena River conditions  
Windy Season: From early December to mid April; prevailing northeasterly winds

Floating berth terminal made by 2 barges with a total length of 118 m

TERMINALS MICHELMAR
Port Restrictions
MAX LOA 170 m
*MAX DRAFT 9.14 m FW alongside
MAX LOAD SIZE. 40,000MT

Current Draft
29 FEET F.W. In the river mouth and the navigational channel (it can change suddenly due to constant river water flow changes)

Windy Season
From early December to mid April; prevailing northeasterly winds.

Shore crane with capacity of 80 MT -Hydraulic grab of 21 m3 / 1 Grab of 12 m3 / 1 Grab of 17m3 - Vessel must be fitted with grabs

Loading Rate: 90 MT X HR X GANG AGW/WP by ship cranes

SPRB – SOCIEDAD PORTUARIA REGIONAL DE BARRANQUILLA
Multi-purpose ocean and river terminal located on the western banks of the Magdalena River which offers a wide range of marine services. It is located about 11 miles from Magdalena river mouth

Port Restrictions
MAX LOA Not determined and it depends on draft. Vessels up to 216 m LOA have been berthed
MAX BEAM Not determined and it depends on draft
*MAX DRAFT 29 ft FW

Total length of the pier: 1,058 m to accommodate 6-7 vessels up to LOA - 5 shore cranes  100 Tons e/o - 4 grabs 10 cbm e/o-  Hoper of 30 Tons - Replenishment of bunkers are usually performed by trucks or barges - Fresh water supplied through pipe connections at the berth

Buenaventura

Location at Sea buoy
03º47,661' N / 077º19,132'W

Channel Length
35 kilometers, about two hours to get to Public Terminal

Services Available
Mdo / mgo, IFO , provisions, fresh water, Slop reception, watchman. No dry-dock facilities The seabed is soft mud. NAABSA clause must be included in all C/P  contracts as this port is considerer under this special condition.

Port Restrictions
Pier 2 Length 595 m
Pier 13 Length 525 m
Current Draft
10.66 mtrs b.w. 1.008 density
Depth alongside: 8.84 mtrs in low tide (NAABSA clause to be inserted when applicable)
MAX. LOA
210 meters. Any vessel with loa above 210 meters should be approved by pilots/harbor master prior fixture.
MAX LOAD SIZE. 45,000MT

*Maximum authorized arrival/departure draft to the Port of Buenaventura is 34 ft BW.  Restriction is based on the entrance to Buenaventura as there is a bar located between the No.1 buoy  &  the No. 25 buoy - Vessel must take pilot 2 HR before high tide in order to cross the bar at exactly the full high tide. The draft at piers during low tide is between 29-30 ft BW. High tides will vary between 9 & 13 ft and also water density fluctuates between 1.006 and 1.014 over the mean therefore vessels with drafts over 30 ft will touch bottom alongside during the low tides

Pilot Assistance
It is compulsory for all domestic/foreign flag vessels over 500 GRT, for entering/departing , as well as shifting between berths.
Pilot boarding takes place only at fairway buoy 03° 47' 39,1'' N 77°19' 08,4'' W . Arrange a pilot ladder 1 meter above water level on portside. Distance from Pilot Station to the Port is 16 nautical miles.

Tug Assistance
It is compulsory for all vessels over 2,000 mt dwt. For vessels over 150 meters LOA, pilot may request a second tug. There are 4 tugs available.

Services Available
Mdo/mgo, IFO , provisions, fresh water, Slop reception. No drydock facilities.

Normal load swl under the spreader: 40.6 mt

Normal load swl underneath the beam with hook : 50.8 mt telescopic spreader for 20´/ 35´/ 40´/ 45´ / 48´ lifting height over the rail: 33 mtrs.

Lifting height below the rail: 15.5 mtrs.

Maximum outreach on seaside: 45 mtrs

Maximum outreach on shore side: 15.2 mtrs. 6 units rtg´s to stack containers in the container stacking yards.

Santa Marta 

Location
Lat. 11 Deg. 15 Min. N Long. 74 Deg. 14 Min. W

Terminal located inside of  Sociedad Portuaria Regional de Santa Marta loading via conveyor belt system and using decks 6 & 7 for this purpose

Port Restrictions
MAX LOA 310 m       
MAX BEAM 41 m
MAX DRAFT 47 ft SW
MAX AIRDRAFT FROM W/L TO THE TOP OF H/C: 15,5 m MAX DISP FOR BERTHING 75000 TONS
MAX LOAD SIZE. 60,000MT

Loading Rate: 1,300 MT/HR

24 hours SHINC all year around - Electrical energy, potable water, cleaning of working areas among other available services

Pilot Assistance
Pilot assistance compulsory for vessels above 500 grt going in/out of the port as well for shifting between piers. Pilot station/boarding position 0.5 nautical mile due S of the morro grande light. Santa Marta port control station and pilots can be contacted on VHF channels 11, 16 and 74. A pilot ladder shall be rigged on the starboard side of each Vessel unless otherwise instructed.

Tug Assistance
It is compulsory for all vessels over 2,000 grt. Four tugs available

Number Of Berths
7 berthing lines for general cargo in a cove forming an inner harbour, Totalling 1,085 mtrs. The pier No.3 is also used as liquid bulk loading/discharging dock, loading/discharging rate 120/150 mtons/hour, the pier No.4 is fitted for grains discharge with suction tower and shore crane 170 m/tons per hour in to two groups of silos, pier No.4 is also used as liquid bulk loading/discharging dock loading/discharging rate 120/150 mtons per hour.

Thursday, March 15, 2007

Ruta del Carbón


CBGroup main achievement and goal until this day, a project patented under the law in Colombia dated on April 2008, book and file number 10-182-438

Transportation License: 001458 Dic. 26, 2007 Issued by the Department of Transportation of Colombia

CBGroup main Objective is to Transport a minimum of 70,000 Metric Tons of coal for month, by means of an efficient and sure operation that guarantees a highly standard of quality of the product and of the service

Equipment

300 Trucks, with a capacity of 40 Metric Tons cargo
Product Information
From Marshalling Yards to Port – Steam Coal
From Port to Interior of the Country – Scrap Material for national consumption
Warehouse Location

Accordingly with the location of the points of Origin and Destiny, the ideal place for the development of the warehouse is in Tocancipa – Cundinamarca.

Activities in the warehouse
  • Logistics and Software operation
  • Maintenance of the vehicles
  • Parking Lot

Social Involvement

The project links in a direct way around 1,500 people, among drivers, administrative and operating personnel.
The number of families’ beneficiated by the project is around 4.700.
The project constitutes a model of competitiveness for the sector and the economy of the country.
              
Drivers/Operators

The operators are selected through a psychological, technical tests application process, study of security and professional evaluations of management that guarantee the excellent operation of the vehicles in highway, with logistic guarantee of the ARP Bolivar (a company in charge of support in highway like AAA)

Driver Performance and Control

The performance of the operators is evaluated permanently by means of the goals compliance, indicators monitoring in productivity, security and care of the vehicle.  Reinforced with the permanent training programs development, promotion and welfare, in which is involved the families, we achieve the integral improvement of human capital

Risk Reduction and Control

In order to the operation to be cover in all the risks involved an alliance with SEGUROS BOLIVAR SA (Insurance Company) will be made. This company would protect all the possible events that occur in the exercise of the contract.